rebar detailer in Revite
Taux horaire: membres seulement
Disponibilité: membres seulement
Disponibilité à voyager: Sur demande
Statut professionnel: Pigiste
Dernière mise à jour: 4 juin 2024
Expérience de travail totale:
Connaissances linguistiques: Anglais,
Sommaire professionel
Work Experience in U.A.E (DUBAI) Two years worked at Group Five construction LLC (Saeed & Mohammed Al Naboodah Group of Companies), Dubai as a steel charge hand. Work Under The Following Projects in U.A.E Housing scheme for Dubai Police and Army Officers at Al-Quoz Dubai Duty free warehouse at Al-Rashidiya Dubai International Airport Terminal 1 – Air shows Day Works Dubai International Airport (AX101) Site Jebel Ali International Airport (Phase 1) Airfield & infrastructure Comprehensive improvement of parallel roads R881-3B project AL-Barsa Work Experience In India Two and half years worked as Civil Supervisor in Sanjeev Gupta Engineers & Govt. Contractor from 2004 to 2006 Nearly two years worked as Civil Supervisor in BS Govt. Contractor from 2006 to 2008. Self Employed Aprox Two Years Construction Pvt. Contractor Currently working at Praniv Enspan Pvt. Ltd. from 2013 to till present. Working as Cad & Revit Technician (Bim Designer):- Prepared drawings for various residential and commercial projects and rebar detailing in RCC detailing, per IS and BS standards. Good in reading structural & architectural drawing. Produce errorless placing drawings. Revise placing sheets and submit patch lists/change orders as needed. Prepared bar bending schedules for the Fabrication Shop. Work Under The Following Projects Product of Rebar Drawings using Loha CAD 2D software including construction drawings and Bar Bending Schedule in following UK projects: - Rathbone Square 22 Bishop gate Tasman House St. John Bosco College Elizabeth House Buckingham Gate TIQ 1, TIQ 2 Macallan Distillery Battersea Power Station Phase II Leiceter Square Strand East – R1 Product Of Rebar Drawings Using Revit 3D Structure 2017-2020 Software Including Construction Drawings And Bar Bending Schedule In Following UK Projects One Palace Street University of Glasgow Wembly W06A Office Block and W06B Residential TVC Plot D HS2 Shepperton South Oxford Humanities Strengths
Connaissances linguistiques
Anglais
Débutant